Application for a logging ticket sample. “Issuance of a logging ticket on the territory of the municipality. List of required information

When choosing a site for an object, the developer may be faced with the need to dismantle the old structure, and for this it is important to know who issues permission to demolish the building in Moscow, and what actions to take to obtain the necessary document. Given a choice between finding new sites and "removing" dilapidated and unusable buildings, construction companies are more likely to lean towards the latter option. The reason for this decision is the opportunity to get a more profitable place for construction.

In addition, the demolition of a dilapidated building can be carried out for the following reasons:

  • A comprehensive development of the territory is planned.
  • There is a corresponding decision of the owner of the structure.
  • The properties are categorized as dilapidated or dilapidated buildings.
  • Unauthorized construction of the building has been proven and there is a court decision.

The main difficulty is the bureaucratic procedures that must be completed in order to obtain permission to demolish the building. Where do you need to apply? Who is responsible for issuing these documents? What paperwork might be required? Let's consider these points in more detail.

According to the legislation, the process of demolition of any structure is a work that belongs to the category of construction and installation activities. This means that you cannot do without obtaining a permit, as in the case of the construction of a new facility. For a document, as a rule, one has to apply to architectural bureaus and municipal authorities (taking into account the existing regulations of instances).

For successful completion of the procedures, it is required to collect the necessary documents that would confirm the right to own the structure or the decision of the judicial authority prescribing the possibility of demolition of the existing object. In addition, before taking any action, it is required to inform the neighbors about the temporary shutdown of water, electricity and other communications. At the same time, it is worth making sure that the nearby fates will not suffer as a result of the demolition of the old building.

What about in the case of a capital object?

If we are talking about the dismantling of capital buildings, we have to go through a more difficult path of bureaucratic approvals. In the situation with structures intended for the residence of several families, several stages are required:

  • Prepare a similar project, which will describe the features of the demolition of the building. The project documentation includes a set of technical documents, which step by step consider the process of "removal" of the old structure.
  • Agree on the process of resettlement of residents of the building to be demolished. This work should not be formalized in words - the decision is documented and subject to current legislation.
  • Coordinate and control the departure of organizations.
  • Prepare the area where the work is to be carried out. This includes the installation of fences, as well as the adoption of measures aimed at protecting the life and health of people living in nearby houses.
  • Turn off the communications of the building that is subject to demolition. The work is carried out with the participation of representatives of the relevant government services. All activities must be agreed in advance and approved in each of these instances.
  • Check the fact of disconnection of the summed communications. This is an important step to eliminate problems with the supply of nearby facilities. At this stage, the functioning of communication systems is checked after disconnecting the demolished object from them.
  • Clean up the area after the completion of the dismantling of the building.
  • Take out the construction debris that was formed as a result of the activities carried out and dispose of the existing waste.

Participants in the demolition of an old structure must have in their hands a full package of permits, licenses and permits that allow them to perform such work with high quality and skill. The time allocated for the demolition of the structure is indicated in the project documentation, and depends on the following factors:

  • The speed of collecting the necessary permits.
  • The activity of resettlement of residents from the demolished building.
  • The presence of bureaucratic difficulties in the process of collecting the required package of papers and so on.

Who issues such permits?

Obtaining a decision that allows you to proceed with the demolition of structures or buildings is the prerogative of:

  • State body of executive power.
  • Executive authorities for the subject of Russia.
  • Moscow Committee for Cultural Heritage (if the object is located in the historical part of the settlement).
  • Local governments.

Moscow needs:

  • Obtain permission from the Moscow State Construction Supervision Authority, allowing you to start preparatory activities at the construction site.
  • Order OATI (for the organization of the construction site).

How to apply?

Before demolishing a building and submitting an application, it is required to develop a project for the planned activities, obtain permission, agree on the implementation of the required scope of work and obtain an expert opinion. All papers are attached to the application, which is submitted to the authorized bodies to obtain permission to demolish a building in Moscow. To speed up the procedure and protect against errors, it is allowed to involve a technical customer. He provides assistance in the process of dismantling and technical support in the creation of project documentation.

During the issuance of a permit, technical supervision employees pay special attention to checking the estimates for future measures for the reconstruction or demolition of the old facility. At this stage, work is carried out to calculate materials and labor costs, as well as the compliance of the taken coefficients and prices with current realities. Compliance with standards, requirements and technology for performing work is also checked.

Required documents

In order to obtain a warrant or permission to proceed with the demolition of a building, the following package of papers must be collected and transferred to the authorized authority:

The full list of documents and acts that are attached to the application includes 29 mandatory papers. Upon completion of the dismantling of the facility, technical supervision employees make sure that the necessary documentation is available before it is handed over by the acceptance commission.

Can permission be denied?

In certain cases, it may be difficult to obtain permission to dismantle the structure. Most often, historical objects, architectural monuments, as well as buildings that are under someone's protection or erected on the territory of nature reserves fall under protection.

There may be problems with obtaining a demolition permit if there is no agreement with one or a group of citizens whose property rights are affected by the dismantling of a particular object. This category also includes co-owners of a structure or residents of multi-apartment buildings.

Results

The demolition of a building is a complex process that involves not only the dismantling of the old building, but also the implementation of a serious set of measures. To avoid problems, it is important to adhere to the work plan and follow safety rules.

In the current regulatory and technical documentation, the concept of "demolition of a building" is absent. Dismantling of existing buildings and structures is considered as one of the types of construction work. In this regard, the procedure for obtaining a permit for the demolition of a building is similar obtaining a building permit. This is due to the fact that in the vast majority of cases, the demolition of an existing building is associated with the construction of a new facility in its place.

For the demolition of the building, it is necessary to develop project documentation, obtain various permits, approvals, and pass examinations. All these documents will need to be attached to the application when obtaining permission to demolish the building. To facilitate the procedure for obtaining a permit and reduce the time of design work, it is recommended to use the services of a technical customer for construction or technical support for the development of project documentation.

The decision to demolish a building or structure is made by an authorized federal executive body, an executive body of a constituent entity of the Russian Federation or a local government body or the Moscow Committee for Cultural Heritage, if the object is located in a historical building area. After receiving permission from the Committee for Cultural Heritage, you can start preparing documentation for obtaining a demolition permit.

In this case, technical supervision specialists pay special attention to the revision of the estimate documentation for the upcoming dismantling or reconstruction work. Calculations of labor costs and materials, compliance with prices and coefficients, compliance with requirements and standards, as well as work technology are checked.

Project documentation for the demolition of the building

When obtaining permission to demolish a building, it is desirable to develop a set of project documentation and provide it to the technical supervision service. In Moscow and the Moscow region, when preparing permits for the demolition of a building, special attention must be paid to the issue of moving demolition waste. To obtain a permit for the movement of construction and demolition waste, including soil, it is necessary to apply to the Department of Construction of the City of Moscow. To do this, you need to prepare a set of documents, which may include:

  • Application for a permit to move construction and demolition waste for recycling.
  • Technological regulations for the process of handling construction and demolition waste.
  • A copy of the warrant and an application for a warrant to OATI.
  • Work schedule.
  • A copy of the contract with the transport organization, certified by the applicant.
  • A copy of the license for handling hazardous waste of the transport organization, certified by the transport organization.
  • Conclusion on the sanitary-epidemiological and environmental survey of the OSS and a copy certified by the applicant.
  • A copy of the agreement with the waste recipient(s), certified by the applicant.
  • A copy of the waste recipient's license certified by the waste recipient.
  • Free waste recipient limits.
  • Estimate for the work of the preparatory period.
  • A copy of the document confirming the powers of the Applicant, certified by the Applicant (agreement between the Investor and the Customer / between the Customer and the General Contractor / between the General Contractor and the Subcontractor).
  • Hazardous waste passport or laboratory conclusion on classifying the waste to the 5th class of environmental hazard

Information on the total volume of demolition waste by category may also be required:

  • construction waste for disposal;
  • breaking of concrete or reinforced concrete for processing at a crushing complex;
  • scrap of ferrous metals for delivery to the metal collection point;
  • non-ferrous metal for delivery to the same point;
  • glass for delivery to the glass collection point.

The volume of project documentation is individual for different buildings. For example, if the walls of a building to be demolished are used as support points for outdoor lighting lines, a tram or trolley bus contact network, a decision will need to be made to move the fasteners to other points. Problems can also arise with engineering networks when they are disconnected from the demolished building. It is necessary to ensure uninterrupted supply of neighboring buildings during the dismantling of the building and the relocation of engineering networks. Each of the upcoming events should be carefully monitored by technical supervision engineers.

Other documents for the demolition of the building

Before starting work, you need to obtain permission from the Moscow State Construction Supervision Authority to carry out preparatory work at the construction site. For the demolition of the building, it is also necessary to obtain an order from the OATI (association of administrative and technical inspections of Moscow) for the organization of the construction site.

The entire list of documents attached to the application required to obtain a demolition order consists of 29 mandatory documents. Upon completion of dismantling works, technical supervision specialists check the set of as-built documentation before handing it over to the acceptance committee.