The project of a two-story hotel from foam blocks. How to open a hotel from scratch

Creating a small hotel is a serious business that will help start a business. But this requires a lot of effort and patience. In addition, it is very important to plan everything in detail.

Site selection is the initial stage in the development of any hotel project. Choose the most suitable area for this. If you are going to make a hotel with 10-20 rooms, then a small area suitable for a private house is enough.

Some design features

Features directly depend on your requirements and plans. Here are some of the parameters that greatly affect the final result:

  • The capacity of the hotel - how many rooms there will be, what type they will be.
  • Target audience - for whom the numbers are intended and who, first of all, will be interested in.
  • Way of catering for customers - will there be small snacks in free time or a planned and organized menu for each day.
  • Availability additional services- whether visitors will be able to use, for example, a bathhouse, a gym, a parking lot.

Creating a mini-hotel project

Projects of mini-hotels can be for the urban environment and natural. The following tips will help you decide on the features of the hotel project, make it special, individual and attractive to customers in your own way.

Feedback from entrepreneurs

If you decide to open your own small hotel business, then you are interested in the reviews of those who have already done so. Entrepreneurs only speak positively about this business. All of them were able to move to those places where they had long wanted to live and work. New acquaintances and a business that brings not only income, but also a lot of positive emotions - all this awaits the organizers of the mini-hotel.

The main thing is to responsibly approach the choice of location and analyze the competition. If everything is done perfectly, then the income will be high. For many, this will be an excuse to move to beautiful place while doing what you love and making money.

Entrepreneurs in the reviews note that at first it is necessary to develop the reputation of the institution among visitors. Satisfied customers will tell about their great pastime and recommend this place to their relatives, friends and acquaintances. "Word of mouth" is known to be the best advertising. Usually a mini-hotel begins to pay off only after several years of successful and high-quality work.

Mini-hotel capacity

First, decide how many rooms you want to make it. It will be difficult to determine exactly, but it is necessary to have an idea and approximate figures. In the future, everything will be calculated in the design process.

During development, the architect determines the location of the hotel building. Many factors are taken into account:

  • the size of the territory;
  • entrance location;
  • ease of entry;
  • What is the view from the windows of the hotel?

The appearance of the building itself, as a rule, is made original and different from ordinary houses.

Initial design

At this stage, you will be able to see a picture of what will happen in the end. It will be as close to reality as possible. Perhaps you will want to make changes, add something else to the free territory hotels. For example, it can be a small car park, a swimming pool. Discuss all additional objects with the designer in advance.

Also at this stage, a layout of the first floor with all functional premises, rooms, corridors will be visible. All subsequent floors are planned on the basis of the first.

The target audience

One of the fundamental stages and the main question will be your target audience, that is, who the rooms of the future hotel are oriented towards. Everything will depend on the clients.

If it will be businessmen, then the rooms need to be made bigger. The contents of the rooms must be of high quality. A car park would be a great solution.

If the main clients are workers and scientists who came for advanced training or a seminar, then, of course, it is better to make the rooms smaller and not so luxurious. In this case, they will be cheaper and more people will be able to afford them.

But the location of the bathrooms will be independent of the requirements. They are always arranged in such a way that they occupy as much space as possible. less space with maximum performance.

Choice of food

The choice of the type of food that you will provide to customers also depends on the layout. In the case of a full-fledged reusable, it should be borne in mind that an equipped kitchen and a pantry will be required for cooking and storage. Sometimes additional space is required. This option involves high costs both in terms of equipment and in terms of the required space with personnel.

If you choose small snacks without a full menu, a small room will be enough. Special kitchens, service rooms, pastry shops, freezers will not be needed. This will not only save on the arrangement financially, but also increase the area suitable for other needs.

As a result, it will be enough to equip a small cafe with a minimum number of specialized tools and premises. In addition, you do not have to hire additional staff.

Choice of services for clients

Any hotel should be able to provide additional services to the client. The bare minimum that is required for hotels is a laundry, a universal ATM, telephone communications and Internet access.

A plus will be the availability of offers of health, preventive, tourist services. In the hotel you can choose a place, for example, for a swimming pool, a massage room, a small gym.

Hotel equipment

In the project of a mini-hotel with 10 rooms or more, it must be taken into account that space for engineering equipment will be required. This includes the heating system, power supply, sewerage, water supply. Additionally in all modern hotels installed air conditioning systems.

This can be an important factor when choosing an institution for a client. No one wants to be in the building during the warm season, feeling like in a bathhouse. Take care of creating the most comfortable conditions.

Split system - the most optimal choice ventilation and air conditioning for a small hotel project. The design of the system uses a refrigerant to transfer heat and cold. The condensate line is responsible for collecting condensate. Despite its seemingly complexity, it does not take up much space.

Think carefully and plan your air conditioning system well. The vertical and horizontal channels through which the air passes take up a significant amount of space during installation.

The issue of heating must be considered very carefully. Immediately decide how the building will be heated, since how much space will need to be allocated and where will depend on this choice.

For example, a gas boiler can be installed in a building, but it definitely needs a separate room. Coal is better to do outside the building, as it emits a lot of dirt and dust. In most cases, it will have to make a small building on the territory, which can ruin the entire appearance hotels.

Often the owners spend a lot of time in their offspring, they can even live in it. When creating a hotel construction project, this fact is also taken into account. For this reason, it is necessary to design it so that no one experiences inconvenience while living. The host part should be well insulated, while there should always be quick access to the guest area.

For this, as a rule, the hotel building is made three-story. One of the floors is completely intended for the owners, the other two - for clients.

The first floor is set up as the main common area. It is here that there is a dressing room, an entrance hall, several bathrooms for common use, a boiler room, a living room, a dining room, and a kitchen. There may also be a recreation area. Exit to the terrace is equipped in the kitchen. The boiler room, in case of arrangement in the building, is located next to the kitchen.

The second floor mainly consists of rooms, a couple of bathrooms with showers, storage rooms, and small recreation areas.

The design of the hotel room must comply with GOST. It lists the required items for the arrangement. These include: a table, a chair, a nightstand, a bed, a wardrobe, a lamp, a mirror, a rug, curtains, bed linen, towels, a lock on the door. The area of ​​the room, designed for one person, cannot be less than 9 square meters. In the case of double rooms, the area is at least 12 square meters.

In addition, you must comply with the requirements of the state in relation to bathrooms. The most important thing to know is that for every 10 people there must be at least one shared bathroom with a shower. Be sure to have daily cleaning schedules with the hours of the procedure and the painting of the person doing it.

If you decide to open your small business, then the hotel will great solution. For the right investment of money, carefully analyze future competitors, choose the most effective location. Try to take into account all the needs of customers when planning. To do this, put yourself in their place. What will they need first? The answer to this question is the basis for a successful start.

Varieties of hotels

Projects of hotels with 10 rooms are the most common. The average area of ​​the rooms is from 10 to 20 square meters. Each room must have a bathroom with a shower.

Ready-made hotel projects can be used for construction in small areas. Free space is arranged, for example, as a park. They make several gazebos, benches, paths in it. The main styles of architecture recommended for the best combination of a building with nature are country and ethno. They are universally used for construction projects. Projects of mini-hotels with 10 rooms are a good solution for starting a business. And the reviews confirm this.

The project of a hotel with 20 rooms is already less common. It is connected with at great expense for construction and maintenance. At a minimum, you will have to select more territory. In addition, the number of required equipment, personnel, and common areas is growing.

A 20-room hotel project can only be profitable if there is little or no competition. You also need to choose a favorable location. IN big cities you should not open a hotel that will not stand out in any way. In these places, the competition can be so intense that you can't even cover the cost of a 20-room hotel project.

Mini-hotels are very popular today. This is a modest but profitable business option. Often, it is with mini-hotels that future bigwigs begin their first steps hotel business. In this article, we will figure out why mini-hotels are so attractive, whether it is worth buying finished projects mini hotels, hotels and how to choose the best mini-hotel projects, look at examples and analyze their advantages and disadvantages.

What is a mini-hotel, and what types of mini-hotels are

There is no clear definition of a mini-hotel, however, there are some characteristics that make it possible to classify a place for temporary accommodation of guests as a mini-hotel. IN Western countries tourism began its development and acquired sane forms much earlier than in the Russian Federation, therefore, there, establishments with a number of places from 1 to 50 are classified as “mini”. In our country, a 50-bed hotel is not classified as small. They are found as options with 2-5 rooms, and hotels are called mini-hotels, on average for 30-50 guests.

The smallest forms of mini-hotels include houses in the south of the country, where, as a rule, the owners themselves live, and part of the territory is rented out to two to five families. Projects of mini-hotels of this home type are usually developed on the basis of existing buildings and a limited area of ​​​​the site. In addition, mini-hotels are often opened in old low-rise buildings. This is very convenient for the owners living in the territory of the same house.

One may get the impression that hotels of this type are necessarily designed for budget tourist, but this is not always the case. Some businessmen rebuild such houses on an individual project of mini-hotels and private premium hotels. The target audience of such houses is very wealthy people who require a special level of comfort, while trying to hide from prying eyes, which a large hotel cannot provide.

To open small place for temporary accommodation of tourists, perhaps, no less labor will be required than for large-scale hotels. But they involve costs, many times less. Before laying the first stones in the construction of a building, a project is needed. There are 2 options for creating visualizations and calculations: ready-made mini-hotel projects and creating a custom-made project. Both options will find a lot of supporters. Consider the main pros and cons of each.

Ready-made projects of mini-hotels - pros and cons

On the Internet, you can easily find a lot of options for every taste, color and budget. This option is quite convenient from the point of view that you can get a lot of ideas from professionals in this field. In addition, you can choose the option you like and order its detailed transcript. The main advantage of ready-made projects is that you do not have to wait several weeks for its development. However, in such a serious undertaking, deliberation does not tolerate fuss.

Hotel plans are full of an abundance of options, choosing from which is not difficult. However, there is a very serious circumstance in the purchase of ready-made solutions: they do not take into account the individual climatic, relief, financial and other characteristics of the customer.

To develop a foundation option suitable for your conditions, for example, as a rule, additional expenses are required. So, for example, developed projects with a basement floor are not suitable for everyone due to the features of the relief, the presence groundwater, communications, etc. In addition, an important factor is the number of storeys of the building. In some areas, the construction of high-rise buildings is not allowed.

Example: a company commissioned a ready-made mini-hotel project next to a small pond. After receiving the schemes and estimates, the construction of the foundation began immediately. At the same time, management submits documents for obtaining a building permit. It turned out that in this area it is unacceptable to coordinate construction work due to the high risk of flooding. This real case witnessed by the author of this article. And there are many such cases.

However, it is not always necessary to be afraid of ready-made solutions. This option suits a lot of entrepreneurs who are trying to save money on the development of design estimates. In "soft" climatic conditions this solution is very popular. The cost of finished projects varies from several tens to hundreds of thousands of rubles.

The development of documentation for a future hotel begins with a discussion of the customer's wishes. The architect listens to the wishes of the owner of the site for the future building. Next, a visit to the site of a specialist of the design bureau is carried out.

The existing site imposes certain requirements and restrictions on the construction. The choice of materials, methods of building a foundation, the possible number of floors and many other parameters that will directly affect both the cost of the project and the price of construction depend on the climatic features of the region.

Depending on the characteristics of the site, soil properties, the presence of groundwater, etc., the maximum suitable options, to choose from which, together with a professional, is not difficult.

Next, the technological characteristics of the future hotel are considered. It is necessary to calculate what will be the area of ​​the building, the number of rooms, the size of the parking lot, etc. Based on the maximum number of guests, a decision is made to introduce a particular heating system, sewerage system, etc.

At this stage, you need to decide not only how many rooms will be in your hotel, but also the range of services provided. The number of rooms is set for:

  • Living rooms.
  • Bathrooms.
  • Parking.
  • Dining area.
  • Reception.
  • technical area.
  • Kitchen.
  • Room for ironing and washing.
  • Places for entertainment.
  • Gym, etc.

You set the set of zones yourself, based on your personal wishes and the footage of the site. The location of these places, exactly like the location of the building itself on the site, takes into account the cardinal points (for illumination), the convenience of entering and exiting the territory, the need for a house adjoining area, a playground and other integral elements of the hotel business.

When the technological characteristics and engineering communications of the future building are considered and approved, the developer proceeds to the concept of a stylistic solution. This stage is the most pleasant for the customer, since it gives the opportunity to visualize the future object, evaluate its attractiveness and give room for imagination.

The advantage of a custom-made project is that it takes into account all the characteristics of the building area. Besides, this option allows you to realize the most interesting and unusual ideas, which, in turn, can help to attract a flow of guests, due to the originality of the performance. The project development time for a mini-hotel can range from several weeks to months.

An important component in the development of solutions is the definition target audience. So, for example, if geographically your mini-hotel will be located near the business center of the city, you should probably focus on single rooms for business guests. If geographically your future hotel is located in a place close to the sights of the city or places of medical services, double rooms will become the best option. If the site is located close to coastal zone, most likely, you will focus on family rooms from 2 to 5 people.

It is possible to satisfy the needs of several categories of guests at once, but it will be difficult to do this if the number of rooms in the mini-hotel is up to 10.

A mini-hotel in a private house is a great solution for those who own own house and household plot. A lot of options for such mini-hotels are located on Black Sea coast, For example. The owners of such family businesses note that this is a rather laborious business, requiring you to constantly be in shape, but it allows you to earn money almost without leaving your home, and use the site as profitably as possible for yourself.

Before ordering a project and equipping a mini-hotel at home, you need to decide on the following points:

  • The estimated capacity of the hotel (the number of separate rooms, the number of beds in each of them).
  • The target audience of the mini-hotel (families, business people, youth tourists, etc.)
  • Catering (kitchen for self-catering, inclusion in accommodation of one, two or three meals a day, or its absence).
  • A set of additional services and entertainment (swimming pool, playground, laundry, etc.)
  • Engineering communications (for example, in mini-hotels southern coasts not necessarily heating when it comes to seasonal business).

In the process of creating a project, the designer works through all the input data and gradually issues schemes, estimates, 3D visualization for approval. The most important thing in the project is the layout of the first floor, where the main necessary premises will be located, such as administration, a technical unit, a hall, etc. There is also a boiler room, a kitchen, a dressing room, storage rooms, storage rooms and much more on the ground floor. On the remaining floors, the layout is carried out according to the parameters of the created first.

One of the most important factors is maintaining the comfort of the owners living in the house. Zone isolation recommended permanent residence owners from guest rooms. This must be observed both for the convenience of guests and for the comfort of owners. If you are planning to open small hotel in your house, keep in mind that you will have to solve a lot of issues without disturbing the peace of the guests, and also get enough sleep, because the tenants came to rest, while it is your work.

If your a private house has a garden plot, it is advisable to use it as a garden with benches, gazebos, a summer kitchen, a small pond, a rock garden, a swimming pool, a children's area. Do not forget about parking spaces for guests' cars. Each of these attributes of recreation will add a lot of positive impressions from living in your family-type hotel, so every square meter of space must be used wisely, and a project specialist will help you with this.

Your own hotel in the house is a matter that requires special patience, work and long, careful planning of every detail. The development of a mini-hotel project begins, first of all, with the selection of a suitable site. Based on this information, an accurate determination of all the moments of the construction of the future hotel takes place. directly depend on a number of certain characteristics, among which the following can be separately noted:

  1. Approximate capacity of the mini-hotel, the number of rooms in it and their types (single or double, one or two rooms).
  2. What categories of customers will the hotel be designed for (family couples, singles, tourists, businessmen, etc.).
  3. How will customers be catering (snacks or a full three meals a day). In the event that you choose the second option, then you will need to select a room for cooking in advance.
  4. What services will be provided to hotel customers (for example, spa holidays)
  5. What engineering equipment will be used to provide the hotel.
The project of a mini-hotel within the city

Small hotel capacity initial stage can only be determined approximately, and more accurate figures will appear directly at the time. Capacity depends, first of all, on the size of the spot of the building, as well as certain layouts carried out on the basis of this spot.

During the design process, the architect must resolve all issues related to the location of the building on the site. At the same time, one should take into account the convenience at the entrance or approach to the territory of the hotel, the development of an attractive appearance of the structure, the panoramic view from the windows of the hotel, its engineering support.

At the first stage of designing a mini-hotel, the most functional and aesthetically attractive zoning of the territory takes place. It is possible that you will have a desire to equip a small car park, a swimming pool, etc. near the hotel, so you should allocate a certain area for these needs in advance.


The project of a mini-hotel in a mountainous natural area

The designer must make an approximate one, filling it with a primary set of various rooms. Due to these actions, the so-called basic planning scheme of the first floor is created, on which the types of planning of the remaining floors of the building will depend.

What categories of customers are designed for a hotel in a private house

The main task in solving this problem is to determine required categories numbers. For example, for clients who came to the seminar, one-room suites are perfect, and for businessmen - two-room suites. In addition, you need to decide how much space these rooms will occupy.

Read also

Installation of a ramp in the entrance

You should also select a list of sanitary equipment for bathrooms. In the course of work, the architect will be able to arrange the devices in such a way that they occupy a minimum area and at the same time function to the maximum.

Which meal to choose: snacks or a complete system

If you decide to give preference to a full three meals a day, then determine in advance the place of storage of raw materials for cooking products (fish, meat, vegetables, etc.). To do this, you will have to equip refrigerators and pantries. Naturally, you will need several additional premises where the cooking process itself will take place (meat and fish, confectionery, cold and hot shops, etc.), as well as auxiliary and service premises.


An example of the layout of a hotel located in a private house

If you decide to limit yourself to snacks, then simple refrigerators can perfectly handle the role of rooms for around-the-clock storage of vegetables. The number of technological and household premises can be reduced to a minimum, enough washing for dishes and the kitchen itself. If you decide to use only semi-finished products for cooking, then there is no need for pantries (the rest of the rooms should be left).


Cafe in a mini-hotel: several tables in a small room on the ground floor

If a small cafe is enough for you, in which drinks, cold and hot dishes will be sold, then the only thing you need to include in the layout is a service room next to the sink and refrigerator.

Service and services in a mini-hotel

On the floors there should be the possibility of taking things for washing, ironing and dry cleaning, and in the lobby there should be banking and payment systems services, telephone communications, various offers from the wellness procedures, recreation and tourism. Next to the building or in it itself, you can equip rooms for spa treatments,

According to the material they are:

  • from SIP panels
  • frame
  • wooden from a bar
  • from all kinds of building blocks

By the number of rooms are divided:

  • projects of mini-hotels for 10 rooms
  • projects for 6 rooms
  • mini-hotels with 20 rooms
  • for 8 rooms
  • projects for 15 rooms

Features in the design of mini-hotels

For your future guests, quality and an adequate price are important.

  1. First, the project must stand out with its appearance.
  2. Secondly, you need a terrace with good view and your guests will be delighted.
  3. Thirdly, these are the rooms, which should be spacious enough. Mini-hotel projects can have rooms of different levels of comfort, but the most important thing is that everything should be clean and tidy, even if simple.


Choose a ready-made project or an individual one?

Designing mini-hotels is a voluminous task, and you need to determine what the future object will do, where it will be located, how many guests to serve. Mini hotels made of sip panels and motels need to be designed in such a way that they are constantly filled with at least 70-80%, which will allow you to quickly recoup the money invested in their construction.

Opening a small mini hotel with 10 rooms for tourists will require much lower costs than, for example. However, neither in the first nor in the second case should you rush - first you need a project. There are two ways for further work - either choose a finished project, or order an individual one. Let's consider both options.

Finished projects of mini-hotels

The option with ready-made projects is convenient in that you simply select the one you need and order project documentation. The main advantage in this case is speed, you do not need to wait several months to work from scratch. Also, a finished project is usually cheaper, and those who save on design are happy with it. If the soil is normal and the construction zone is not protected - why not? The price for ready-made projects of mini-hotels for 10 or 6 rooms starts from dozens, and goes for hundreds of thousands of rubles, depending on the complexity and number of rooms.

There is only one drawback - finished projects do not take into account the regional, soil, financial characteristics of the client. For example, multi-storey projects are not always suitable - in the case of weak soils, groundwater, etc.

Individual design

Discussion of the client's wishes - the beginning of work on an individual project of a mini-hotel from sip panels or timber. Experienced specialists will listen to the owner of the future object, and in case of difficult terrain, they will go to the site.

Specialists together with the owner will take into account the features of the site, the presence of groundwater, climatic features and choose the type of foundation, building material, number of floors, and a number of other parameters that affect the cost of construction.

  • Simple accommodation?
  • Do you need another restaurant or cafe?
  • Add a bath or sauna?
  • Do you need a pool and spa area?
  • Gym?
  • If the project will be located in a protected area or near healing springs, include spa stay?

After considering and approving the characteristics, engineering systems of the future mini-hotel, specialists will develop the appearance and style of the building based on the wishes of the customer. At this stage, the object will be rendered in 3D, you can evaluate its appearance and make comments. After the preliminary design is agreed, plans, schemes, drawings, engineering communications are gradually worked out and coordinated.

Individual design will take into account all the characteristics of the site and the external environment. And of course, such a project will be completely unique, which will help in attracting tourists. Terms of individual design - from 3-4 weeks to several months.

The construction of a hotel complex or even a small hotel requires a separate approach to the layout of the premises. It is important to take into account not only internal arrangement rooms, but also corridors, and a hall, and even utility rooms. Therefore, the hotel project is drawn up, focusing first on the needs of future guests and taking into account the convenience of service by the staff.

Hotel types

It must be said that initially designers do not focus on the number of stars or other insignia of hotels. First of all, you need to decide on with total area and expected number of visitors. For example, mini-hotel projects should make rational use of free space, while large hotels can afford spacious halls and even terraces.

Hotels with 10 rooms

Buildings of this type are considered the most compact and are often created with their own specific maintenance. Some projects of hotels with 10 rooms often do not have separate bathrooms in the rooms, but assume their location in the form of a block for several users. They also minimize the space dedicated to registering visitors.

If the rooms themselves are equipped with a toilet and a shower, then when designing them, special attention should be paid to communication systems. They should not take up much space, it is best to bring them to two separate risers. It is also worth thinking about organizing a separate shutdown of at least several sections.

Some projects of hotels with 10 rooms are made in the form of an ordinary house, but with an extensive system of rooms. Such a solution fully justifies itself from the side of both saving space and comfort for customers. The result is a cozy home-style hotel, where people meet in the common dining room in the morning, and in the evening they can chat in the living room.

Hotels with 20 rooms

When creating a hotel project for 20 rooms, it is important to understand what it is already necessary for such a number of visitors to have. Considering this, you should immediately take care of allocating a room for their rest, storage of personal belongings and meals. You also need to create a room for a warehouse and other similar premises.

Most often, such hotels are made either in the form of a house on several floors or have rooms under one roof, but on the entire area. Usually the owners of such hotels try to save space and prefer the first version. However, if the conversation turns to roadside establishments, then such a 20-room hotel project implies a large parking lot, which can be surrounded by separate buildings.

Hotels with 50 rooms or more

These designs are complete hotel complexes and in addition to the usual rooms have a number of additional facilities and facilities. Such buildings are erected on several floors, trying to arrange everything necessary for maintenance in the basement or at the basement level. Typical projects of hotels with 50 rooms usually have a spacious hall, left-luggage offices, places for recreation and a host of other areas necessary for receiving guests on the ground floor.

Also, such hotels often have their own restaurant, intended not only for guests. It is located on the ground floor and is equipped with an additional separate entrance. In fact, the plan of the restaurant itself is a separate project, and they are developing it, focusing on the already finished space allotted during the manufacture of the main building.

Almost all such complexes provide a range of additional services, which include laundry, massage, gym and much more. Therefore, when projects of hotels with 50 rooms are created, this moment must be taken into account, especially if the room needs communications.

Hotel Design Principles

Typical placement of rooms implies the presence of which rooms are located. Such a hotel project is considered the most common, and it is used almost all over the world. The fact is that it is thanks to him that you can save maximum space and create convenience for future visitors and staff. However, there are other principles for the location of rooms, suggesting a special design or level of comfort.

Terraces

Most often these are projects of mini-hotels. They are made in the form of two-storey buildings with terraces on both levels. These structures perform the function of a conventional corridor open type. At the same time, this placement of rooms involves the creation of a separate administrative building with a small store. Canteens or restaurants are usually not provided in such options.

Suites

Very often, projects involve the presence of several rooms for wealthy clients. They are located on a separate floor and can have their own administrator's desk and even separate security and servants. At the same time, given the dimensions of these rooms, there can be only two of them.

Some hotel owners, when designing these floors, insist on creating a separate entrance from the parking lot. This is very convenient if pop stars or politicians visit the hotel. If this is not possible, it is proposed to make a special elevator with closed access.

Penthouse

Such a hotel project is rare. However, if it is possible to make such a structural change, then this should be used. The fact is that on this square it is very convenient to create elite rooms for wealthy clients or rent them out for banquets and holidays.

Given this specificity, it is very important to properly organize the access of visitors to this floor. Therefore, such projects often include the presence of freight and passenger elevators. However, do not forget about the rules of fire safety and take into account the possibility of emergency evacuation.

Furnishings of the rooms

Typically, a hotel room project is created depending on the desired level of comfort. However, if we talk about the average conditions for living in standard hotels, then you should pay attention to the mandatory criteria inherent in these areas.

layout

  • First of all, the room must have a bathroom. Almost all hotel construction projects take this into account and take care of all the necessary communications in advance.
  • The area of ​​the bathroom is determined based on the dimensions of the entire room allocated for the organization of the room. Given this, many hotel owners are trying to save money and are planning to install a shower cabin, which greatly saves space. This is especially important if the redevelopment of the old building is being designed, and not construction from the foundation.
  • A typical layout assumes the presence of at least one window. However, it is worth remembering that it is not recommended to install a bed under it, which means that there should be enough free space in the room. This is often taken into account by moving the window as close as possible to one of the walls in the presence of one bed or by setting it in the center, taking into account two beds.
  • In general, the issue of planning such rooms is very individual and depends on the personal preferences of the owners. At the same time, there are certain catalogs produced by well-known publications that offer to adhere to certain foundations in this area. It is believed that the uniformity of standard rooms does not cause discomfort or inconvenience for people who are constantly traveling and using such services.

Arrangement

When creating a hotel project, it is very important to take into account the arrangement of furniture and household appliances in the rooms. This is required in order to correctly bring the necessary communication and understand what dimensions of the room are needed.

The standard furnishings in the room include at least a bed, a chair, a table and clothes hangers. At the same time, many hotel owners install a refrigerator, mini-bar, wardrobe and even a TV. Such filling of the room requires proper placement and additional space.

  • Before proceeding with the development of the project, it is necessary to familiarize yourself with the fire safety regulations of a particular region and the requirements of the sanitary service. They can be very different from each other not only in different countries but also in areas that are associated with climate change. At the same time, these recommendations and rules must be strictly observed during development so that the building can be put into operation.
  • If a hotel plans to receive a certain number of stars, then it needs to have all the services and services that a particular category suggests. Therefore, before sitting down to the drawings, it is very important to study the requirements of specific publications and authoritative critics in order to take into account, among other things, those shortcomings that were found even in well-known and respectable hotels.
  • If we are talking about a small hotel or the redevelopment of an ordinary house into a hotel, then in this case it is very important to save free space, but at the same time not create cramped conditions for future residents. As a result, the level of comfort will be reflected in the cost of living and the income of the entire enterprise. The most responsible owners of such buildings involve even economists and marketers in the development of the project.
  • It is important to remember that some types of such buildings are subject to compulsory registration and approval by the relevant authorities. Therefore, it is very important to know all the requirements in advance and make an agreement at the development stage.